Day 1 (24/11/2014)
I'm still ill today, resting in bed...
Day 2 (25/11/2014)
I'm still recuperating inside my cave...
Day 3 (26/11/2014)
Today, I decided that I was feeling well enough to leave my lair and go to work. Anymore rest and I might as well hibernate for the winter. I ran and terminated a bunch of coaxial cables inside the trailer for a couple of components.
Day 4 (27/11/2014)
Thanksgiving day
Day 5 (28/11/2014)
Black Friday
Day 6 (29/11/2014)
As the past two days were holidays and we're not working on next monday, we decided to work today. In the evening, we soldered 4 RCA audio connectors. It was most difficult and tedious as the connectors were small and the wires kept coming loose.
Day 7 (30/11/2014)
Today as usual, we shot the Sunday church service. During the Cantonese service, I was the video engineer. But unlike the previous times as an engineer, I'll have 1 remote camera to control while the remote camera operator will control the other 2. Unfortunately, the service was fraught with problems such as the Tricaster video switcher freezing, the intercoms not working and a host of other issues. After lunch, we started to fix the problems one by one. We then went cleared up the former control room, removing most of the remaining components. At night we played around with the various equipment in the trailer. I played with the remote cameras and managed to understand some of the strange aspects of the camera such as the white balance.
Day 2 (25/11/2014)
I'm still recuperating inside my cave...
Day 3 (26/11/2014)
Today, I decided that I was feeling well enough to leave my lair and go to work. Anymore rest and I might as well hibernate for the winter. I ran and terminated a bunch of coaxial cables inside the trailer for a couple of components.
Day 4 (27/11/2014)
Thanksgiving day
Day 5 (28/11/2014)
Black Friday
Day 6 (29/11/2014)
As the past two days were holidays and we're not working on next monday, we decided to work today. In the evening, we soldered 4 RCA audio connectors. It was most difficult and tedious as the connectors were small and the wires kept coming loose.
Day 7 (30/11/2014)
Today as usual, we shot the Sunday church service. During the Cantonese service, I was the video engineer. But unlike the previous times as an engineer, I'll have 1 remote camera to control while the remote camera operator will control the other 2. Unfortunately, the service was fraught with problems such as the Tricaster video switcher freezing, the intercoms not working and a host of other issues. After lunch, we started to fix the problems one by one. We then went cleared up the former control room, removing most of the remaining components. At night we played around with the various equipment in the trailer. I played with the remote cameras and managed to understand some of the strange aspects of the camera such as the white balance.
No comments:
Post a Comment