Week 6 of internship. After a week of being busy, we were given a day off. We went out to celebrate Mr Kent's birthday. When we got back, we decided to help pack up and tidy up the studio.

Day 30 (25th November 2014)

For today's tasks, we were to work in the trailer once again. I had to prepare 6 coaxial cables, each measuring a 100ft. After which, I was asked to export the thanksgiving video, and upload to youtube. However, there was a problem with the subtitles and I had to fix it, and re-export the video. We have a rather long list of things to do this week. Look forward to it.


Day 31 (26th November 2014)

Today's once again another day where I had to report for work slightly earlier than the rest. Together with Peter, we finished the first canvas, with the help of a chalk line. It was really a life saver as the vanishing points and lines could be more efficiently drawn out. After which, I went on to the trailer to help out with the other stuffs. I was tasked to terminate more BNC cables in the box outside the trailer. And when I was done with it, I had to label each cable accurately. Good news is that we are finally done with one of the canvas, and bad news is there are still lots to be done. Well, that's about it for today. It's a long rest for all of us due to public holidays. Stay tuned for more updates!


Day 32 (29th November 2014)

Today we decided to work on the trailer again, as we were granted a day off on next Monday. I started off by laying some cables in the trailer. Then I went on to terminating 2 BNC cables in the machine room, followed by connecting it to the respective slots. It was also the day of the ChristmaSing Rehearsal. We managed to get a sneak peak of how the event would look like on the actual day.