Tuesday, December 23, 2014

Week 10

22 Dec 2014

Good afternoon everyone, the whole crew get to sleep in and report after lunch. We reported in the afternoon and set up the cameras in the sanctuary. After setting up the cameras we then run the cables and boot up the whole tricaster to make sure the feed is working. I reset the tricaster projects because there was a different input and renaming in silver compare to scottish rite.

Here is the mess in the studio.




After resetting it, we then check the sound system. We then install back the router into the trailer. Harry then have to troubleshoot and reprogram everything. We call it a day after that. 

23 Dec 2014
Off Day; Went to Alcatraz

24 Dec 2014
Christmas Eve Break

25 Dec 2014
Christmas Day Break

26 Dec 2014
Good morning everyone, we started the day by loading all the projector screens into harry's car to return to PSAV. It took us quite a big of time to load it up because we have to rearrange it so that we can make sure it safely loaded into harry's car.   



After returning the projectors, we had lunch and headed to Lowes. We bought 4 racks so that we can store the equipment neatly in the studios. 


We went back to studio and fixed up one of the racks. The whole crew felt that the structure was too soft and was not steady enough to handle the weight of the equipments. We decided to refund the remaining three. We headed by to Lowes again.  


Harry then drive us past Palace of Fine Arts to have a peak of the night view. We called it a day after dinner. 