Friday, January 2, 2015

Week 10
Day 1 (22/12/2014)
We started out late today since we ended the previous day in the wee hours of the morning. We had lunch first before we set up the cameras, tripods and the fibre optic cable in the sanctuary. After that, we hooked up the cables that were unplugged back into the trailer and tested the trailer's system to see if they work properly

Day 5 (26/12/2014)
We started out by loading the projector screens into Harry's car so that they can be returned to the rental company. While the screens are being returned, we packed up and organize part of the studio. After Harry returned, we went out to Lowes to buy some racks to store the stuff in the studio. We set up one of the racks and realized that it was not of high built quality. The rack was quite flimsy and we decided to drive back and return the remaining 3 that we had not yet built. (And I'm sick again. Feeling tired, cold and coughing continuously)

No comments:

Post a Comment